|
Site PrepThings To Consider:1. Access To PropertyDoes your lot sit on a busy street, or intersection? Does the street allow for heavy machinery parking, or building material delivered by a Moffett truck? 2. Access To SiteDo you have a side yard of 7’ 6” or more? Will a backhoe loader fit through the left or right or your existing house? 3. Utilities In YardThis pertains to existing underground obstacles that may be cut or trampled in the construction process. Do you have a sprinkler system, septic tank, buried hydro or water line? In order to build in your yard we use Kubotas, and other equipment to deliver and construct. Services will be trenched and connected from the unit into your existing homes basement. This includes: |